Dear experts,
We’ve followed the configurations steps for single sign-on on SAP Netweaver Portal and Success Factors.
http://scn.sap.com/docs/DOC-29737
However, we would not able to connect and navigate on Success Factors.
When I test the iView created, the message it shows the message “ERR_CONNECTION_TIMED_OUT”.
So I’ve already tried:
- Change the links.
- Review all the configuration steps.
- Download the Success Factors certificate.
- Upload again the Portal certificate.
Thanks for any inputs.
Regards,